Students are asked to be mindful of any issues with the space as there have been traditionally problems with the HVAC in the suspended ceiling. Please note that any concerns should be brought to the instructor, Frank, and the office.
Tuesday, January 17, 2012
It Begins Once Again...
The Winter 2012 Option Studios began today and those enrolled in the Subtlety & Spectacle Section moved into their new studio space on the ground floor. It would be interesting to compare the sparse and sterile imagery of the room now against those taken at the end of this term.
Students are asked to be mindful of any issues with the space as there have been traditionally problems with the HVAC in the suspended ceiling. Please note that any concerns should be brought to the instructor, Frank, and the office.
Students are asked to be mindful of any issues with the space as there have been traditionally problems with the HVAC in the suspended ceiling. Please note that any concerns should be brought to the instructor, Frank, and the office.
Labels:
ceiling,
HVAC,
Studio space
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment